Swerock Hagby
PROJECT

Swerock Hagby

Efterklang has conducted noise measurements at Swerock's mining site in Hagby.

Project details

Client
Swerock AB

Year
2019 - 2022

Background

In October 2022 Swerock applied, and was granted continued and expanded mining and recycling operations at the company’s existing mining site at Fredriksdal 2:2 in Trosa municipality.

Assignment

During the period of 2019-2022, Efterklang conducted noise inquests for the proposed operations. The study was carried out through several noise measurements in the mine, and noise propagation calculations for each mining situation that is expected to represent the worst-case scenario with regards to noise impact on the surroundings.

Traffic noise inquests have been made on the public road and calculated with and without additional mining traffic along road 838.

Efterklang has also participated in the main hearing which took place in September 2022 at the Land and Environmental Court. Efterklang presented the noise inquests and answered questions from authorities and private individuals.

Result

The noise inquests are a part of the environmental impact assessment, which is part of Swerock’s permit application. A thorough noise study is important for the customer as it simplifies communication with relevant authorities in these matters.

We at Efterklang have extensive experience in both the industry and participating in main hearings.

 

Contact person
Pär Wigholm
Pär Wigholm